NORTH BUFFALO CREEK OUTFALL

LOCATION

GREENSBORO, NC

APPROX. VALUE

$20,163,208.81

OWNER

CITY OF GREENSBORO

ENGINEER

ARCADIS

PROJECT DESCRIPTION

This project consisted of installing 13,390 LF of 54-inch and 4,769 LF of 60-inch diameter gravity outfall sewer, 80 manholes ranging in depth from 12 FT to 28 FT, a jjunction box, 460 LF of 80-inch liner plate tunnel, 288 LF of 72-inch steel casing pipe installed by bore & jack, (3) siphon boxes, pile drive steel sheeting, extensive bypass pumping, vast amount of trench rock, and multiple connections to existing sewer, water & reclaim water relocation.