DEER CREEK OFFSITE UTILITIES
LOCATION
APEX, NC
APPROX. VALUE
$5,540,000
OWNER
MERITAGE HOMES
ENGINEER
WITHERS RAVENEL
STATUS
COMPLETED - 2017
PROJECT DESCRIPTION
The project consisted of the construction of a 1,380 GPM Pump Station with two 60 HP pump motors, a 150 KW generator, a 12 FT diameter wet well that was approximately 50 FT deep and the associated mechanical piping and equipment. In addition, this project included the installation of approximately 2,800 LF of 12-inch gravity sewer line, 5,600 LF of 14-inch sewer force main, & approximately 8,900 LF of 12-inch water line.